Year acquired
2019
The Stockyard Wind redevelopment portfolio consists of 149MW of wind assets across eight projects located north of Amarillo, Texas that serve the Southwest Power Pool. The assets began operation in 2008/2009 and consist of 101 Suzlon turbines. GlidePath has undertaken preliminary repowering development and is currently evaluating installation of a battery storage asset at one of the sites.